In the summer of 2008 Ronald was contacted by a Washington, DC firm and asked to paint all of the steel
doors on the buildings exterior to match the marble on the outside of the building. Ronald completed the project
of 24 in 11 days by himself

|
In this picture there are 3 sets of double doors that are 12 feet high and 8 feet wide, look to
the left of the second column on the right and to the left of the the column on the right
|

West side
|

Ronald in front of a completed door
|

Many of the large doors have smaller access doors and exposed hinges
|

Ronald next to one of the completed doors, this shows an better example of
the scale of the project, if you look to the right you will see a second set of doors
|

A completed door |